Pacific ships

USN · DD

Afloat

Fletcher-class destroyer. Bath Iron Works. Commissioned 19 October 1943. A mine off the Palaus on 16 September 1944 killed three men. She was not sunk. She was in Tokyo Bay for the surrender. Chile took her in 1962.

ClassFletcher class
TypeDestroyer (DD)
HullDD-689
BuilderBath Iron Works
Launched1943-08-07
Commissioned1943-10-19
FateAfloat. Survived the war. Mined off the Palaus on 16 September 1944 and not sunk. Decommissioned 28 June 1962. Transferred to Chile as Blanco Encalada on 26 July 1962. Sunk as a target on 28 September 1991.
Armament (class)Five single 5-inch guns, two funnels, and two sets of torpedo tubes.
Command

Laid down, displacement, length, beam, draft, speed, and complement are not stored for each hull, so this table leaves them out.

The armament line is the class drawing, not a measurement of this hull.

U.S. Navy photo NH 98050. USS Barry (DD-933) and USS Wadleigh (DD-689) underway off Rhodes, Greece, in June 1958 (NH 98050).jpg. Public domain, via Wikimedia Commons

The pictures on this page are the originals.

Command